Personal tools
You are here: Home
Navigation
« November 2009 »
Su Mo Tu We Th Fr Sa
1234567
891011121314
15161718192021
22232425262728
2930
 

Search results

Did you not find what you were looking for? Try the Advanced Search for more precise search options.

78 items matching your criteria. RSS Feed
untitled folder [1%] by dale, 2008-07-26 05:28 PM
My computer [1%] by dale, 2008-07-16 09:26 PM
Links to data systems and portals [1%] by dale, 2008-07-15 09:12 PM
Mostly earth science systems/sources
Dale's bibliography [1%] by dale, 2008-07-15 09:11 PM
Abstracts, papers, etc.
References [1%] by dale, 2008-06-20 11:55 AM
Interesting and potentially useful stuff
Science support presentation to AICC [1%] by dale, 2008-02-25 06:03 AM
Annotated PDF of Dale's presentation to AICC in Seattle, November 2007
BGM-3 (temporary installation) close-up [1%] by dale, 2008-01-23 04:00 PM
A close-up picture of the rack of electronics. The LDEO BGM-3 buffer interface is at the top followed by a rack-mount computer with built-in display, a ...
BGM-3 [1%] by dale, 2008-01-23 03:58 PM
A small rack with the electronics was installed next to the active cathodic protection system. The sensor platform (black) is behind the rack. Photo is looking ...
Temporary BGM-3 [1%] by dale, 2008-01-23 03:56 PM
A Bell BGM-3 from the NSF gravity meter pool was installed in 2004-2005 for Bernard Coakley of UAF
Marine Gravity Meters on Healy [1%] by dale, 2008-01-23 03:55 PM
After science rack [1%] by dale, 2008-01-23 03:55 PM
Close-up of the aft science rack
Starboard-Aft corner [1%] by dale, 2008-01-23 03:54 PM
The after science rack is to the right and the foundation for the old PBX is to the right.
Science racks in IC Gyro [1%] by dale, 2008-01-23 03:53 PM
Two racks are installed in IC Gyro for science gear. Picture is taken looking to starboard. The right side rack (forward) has the two ADCPs plus the primary ...
Foundation from old PBX [1%] by dale, 2008-01-23 03:51 PM
The likely location for the installation of the BGM-3 marine gravity meter is on this platform. Picture is looking aft.
IC Gyro [1%] by dale, 2008-01-23 03:49 PM
Pictures in IC Gyro
HLY08TA Shakedown seasnake concept [1%] by dale, 2008-01-22 10:19 PM
A couple of concept sketches for a boom to tow the seasnake. (PDF file ~240kB)
Healy HCO [1%] by dale, 2008-01-16 09:00 PM
Looking aft from the bridge deck. HH60 for scale
Healy HCO [1%] by dale, 2008-01-16 08:59 PM
Looking aft from the 04 deck by the stack
Healy HCO [1%] by dale, 2008-01-16 08:58 PM
Looking forward from the aft edge of the flight deck
Healy flying bridge [1%] by dale, 2008-01-16 08:57 PM
Looking forward (along the centerline) on the flying bridge
Healy bow [1%] by dale, 2008-01-16 08:56 PM
A close up around the bull nose.
Healy Bow [1%] by dale, 2008-01-16 08:55 PM
Real-time shipboard displays for science operation and planning on USCGC Healy [1%] by dale, 2008-01-15 08:37 AM
Poster presented at the American Geophysical Union fall meeting, December 2007. Authors: Steve Roberts (UCAR), Dale Chayes and Robert Arko (LDEO/CU) PDF ...
Papers and publications [1%] by dale, 2008-01-15 08:24 AM
Links to papers and publications related to the USCGC Healy and our technical support of Healy
Science Lab Upgrades [1%] by dale, 2007-12-27 08:21 PM
The ECR for the the current (December 2007) science plan upgrades
Healy Plans [1%] by dale, 2007-12-27 08:20 PM
Links to plans for Healy science systems
Dale's OS X hints, clues & links [1%] by dale, 2007-12-23 10:40 PM
A collection of (mostly) links to other peoples clues and hints about OS X
Cold is a relative thing.... [1%] by dale, 2007-12-23 03:38 PM
Shipboard power systems are different [1%] by dale, 2008-07-17 06:06 PM
The Alternating Current (AC) power systems on ships are differnt
Dale's N800 links [1%] by dale, 2007-03-28 05:30 PM
Assorted links to Nokia N800 apps, notes. tec.

Powered by Plone CMS, the Open Source Content Management System

This site conforms to the following standards: